Practical container guide
Prepare the site and responsibilities before delivery day
Arranging 40 ft container delivery in Ghana involves more than giving a driver the final address. The provider needs to know whether the vehicle and offloading equipment can reach the site, where the container will be positioned and who is responsible for preparing that position.
Discuss these details before accepting the final delivery scope. Access photographs and a clear placement plan can reveal problems early, while a vague instruction to leave the container “at the premises” can leave important decisions unresolved.
Confirm the approach, gate, turning space, overhead restrictions, ground conditions, placement position and offloading responsibilities with the delivery provider. Agree what is included and what must be ready before dispatch.
Provide a clear site information pack
- The delivery address, location pin and contact person who will be present.
- Photographs of the approach, entrance and proposed placement area.
- Available gate opening and any known access or turning restrictions.
- Visible overhead cables, structures, trees or other obstructions.
- The preferred container position and direction of the doors.
- Any site rules or restricted receiving times the provider must plan around.
Describe obstacles rather than relying on photographs alone. If access is uncertain, arrange an appropriate site assessment with the delivery and placement team before confirming the booking.
Check the entrance and approach together
A wide gate does not establish that a delivery can be completed. The approach, bends, turning area, traffic constraints and available operating space also matter. Ask the provider to assess the proposed access for the vehicle and equipment they intend to use.
A container’s dimensions are not the required operating envelope for the delivery vehicle or lifting operation. Do not use the nominal 40 ft length as a substitute for the provider’s access assessment.
Agree how offloading and placement will be handled
| Responsibility | Agreement needed before dispatch |
|---|---|
| Transport | Who delivers the identified unit to the agreed site? |
| Offloading | Who supplies and operates equipment suitable for the unit and conditions? |
| Site preparation | Who assesses and prepares the ground and supports? |
| Final position | Which location and door orientation have been approved? |
| Changed conditions | Who decides the next step if access or placement is unsuitable on arrival? |
Have competent operators plan the offloading method and operating area. The receiving team should know whom to contact and keep unnecessary people away from the operation, following the provider’s instructions.
Prepare the position for its intended use
Discuss ground suitability, drainage and support requirements with a competent person responsible for placement. A visually flat area may still require assessment. Avoid deciding support positions or foundations from a generic online checklist.
For storage, also leave room for the doors to open and for people or handling equipment to move goods. Confirm that the container will not block existing site access or create a position that cannot be used as intended.
For an altered container, agree the preparation and inspection requirements with the relevant providers before delivery. Any proposed electrical, structural or other specialist work needs its own scope and appropriate expertise.
Check the unit and handover on arrival
Match the container to the agreed identification and supply description. Record visible differences or damage with photographs and raise them with the provider before completing the handover record.
Once placement is complete and it is safe to do so, check that the doors can operate as intended and that the position matches the agreement. Review the agreed preparation or repairs and identify any outstanding items in writing.
Keep the quote, delivery scope, contact details and handover record together. If conditions prevent safe placement, pause and agree the next step with the provider rather than improvising a different position or method.
Connect delivery planning with the buying decision
Review what a complete 40 ft container quote should include so transport and offloading are visible in the budget. If the container is for business storage, use the 40 ft storage planning guide to check the daily access and layout before fixing its final position.

Discuss your container delivery location
Send BJH Logistics the site location, intended use, access photographs and proposed placement position. Ask for the transport, offloading and site-preparation responsibilities to be confirmed before booking.
Does container delivery include offloading?
Only when the agreed quote includes it. Confirm who supplies and operates the offloading equipment, where placement is included and which preparation remains the receiving site’s responsibility.
What happens if the delivery vehicle cannot access the site?
The provider and receiving contact should agree the next step under the booking terms. Discuss this possibility before dispatch, including any change to timing, equipment or charges, rather than leaving it unresolved until arrival.


